Skip to content

Clarify UVAI Home-to-Studio sprint demo agenda evidence boundaries - #2054

Closed
groupthinking with Copilot wants to merge 2 commits into
mainfrom
copilot/add-sprint-demo-agenda
Closed

groupthinking with Copilot wants to merge 2 commits into
mainfrom
copilot/add-sprint-demo-agenda

Conversation

Copilot AI commented Sep 18, 2026

Copy link
Copy Markdown
Contributor

Canonical issue

Linked automatically by the system.

Outcome

Adds a tighter UVAI Home-to-Studio sprint demo agenda: each time-boxed segment now states the expected result, the backing evidence, and the fallback path, while keeping the document explicit about non-production status and evidence limits.

Scope

  • Included:
    • Agenda structure: renamed the document to the UVAI Home-to-Studio demo and split the run-of-show table into explicit Expected result, Evidence, and Fallback columns.
    • Evidence guardrails: strengthened the opening language so presenters distinguish local/branch evidence from reviewed remote proof and avoid accidental production claims.
    • Regression coverage: added a narrow doc test that locks the new heading, table shape, and non-production wording.
    • Example:
      | Time | Owner | Demo action | Expected result | Evidence | Fallback |
  • Explicitly excluded:
    • App behavior, deployment flow, billing flow, OAuth behavior, Origin G.A.T.E. logic, and any production configuration or readiness claim.

Risk

  • Risk level: low
  • Failure mode: the agenda or its guardrails drift later and presenters lose the evidence/fallback structure.
  • Rollback: revert the doc/test pair.

Verification

Current head SHA: 11502383489f335e37384b5346e012bcbd1909cd

  • Focused tests
    • python -m pytest --no-cov tests/unit/test_sprint_demo_agenda.py -q
    • git diff --check
  • Required CI
  • Review threads resolved

Production evidence

Not applicable. This PR is documentation-only plus a documentation regression test; it does not change runtime behavior, Vercel deployment state, or production evidence.

Agent handoff

  • One canonical issue is linked
  • No competing PR implements the same issue
  • Acceptance criteria are satisfied
  • Required checks pass on the current head
  • Human decision is requested only for product, security, irreversible infrastructure, or production approval

@coderabbitai

coderabbitai Bot commented Sep 18, 2026

Copy link
Copy Markdown
Contributor

Important

Review skipped

Ignore keyword(s) in the title.

⛔ Ignored keywords (3)
  • WIP
  • DO NOT MERGE
  • [skip ci]

Please check the settings in the CodeRabbit UI or the .coderabbit.yaml file in this repository. To trigger a single review, invoke the @coderabbitai review command.

⚙️ Run configuration

Configuration used: Repository: groupthinking/EventRelay/.coderabbit.yaml

Review profile: ASSERTIVE

Plan: Advanced

Run ID: 0a558a22-bfdc-4133-a6aa-3592fb9d9894

You can disable this status message by setting the reviews.review_status to false in the CodeRabbit configuration file.

Use the checkbox below for a quick retry:

  • 🔍 Trigger review

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

Co-authored-by: groupthinking <154503486+groupthinking@users.noreply.github.com>
Copilot AI changed the title [WIP] Add evidence-backed sprint demo agenda for UVAI Home-to-Studio Clarify UVAI Home-to-Studio sprint demo agenda evidence boundaries Sep 18, 2026
Copilot AI requested a review from groupthinking September 18, 2026 21:29
@kk-agent

Copy link
Copy Markdown
Collaborator

AXIOM keep-moving: closing as duplicate of docs checklist/agenda PRs (#1993/#1992).

@vercel

vercel Bot commented Sep 18, 2026

Copy link
Copy Markdown
Contributor

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
v0-uvai Ready Ready Preview, v0 Sep 18, 2026 9:59pm UTC

@github-actions

Copy link
Copy Markdown
Contributor

✅ E2E Test Results: ALL TESTS PASSED

Metric Value
Status 🟢 GREEN
Total Tests
Passed 19
Failed
Deployment https://v0-uvai-8e8snr5xl-garv1.vercel.app
Test Output
tdout�[2m | tests/e2e/pipeline.test.ts�[2m > �[22m�[2mEventRelay E2E — Live Deployment�[2m > �[22m�[2mSSE Pipeline Stream�[2m > �[22m�[2mSSE stream emits at least a pipeline_status:running event
�[22m�[39m[E2E] last pipeline_status: complete

 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mSSE Pipeline Stream�[2m > �[22mSSE stream emits at least a pipeline_status:running event�[33m 26798�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mSSE Pipeline Stream�[2m > �[22mSSE stream closes within 90 seconds (no 95% hang)�[33m 20554�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mSSE Pipeline Stream�[2m > �[22mSSE events fire in correct agent order�[33m 18640�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mCloudEvent Schema�[2m > �[22mSSE events contain valid timestamps�[33m 14771�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mCloudEvent Schema�[2m > �[22mterminal pipeline_status includes duration and stage progress�[33m 16508�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mError Handling�[2m > �[22mmissing URL returns 400, not a hang�[32m 58�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mError Handling�[2m > �[22minvalid URL returns error event or completes quickly, not a hang�[33m 7344�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mDashboard�[2m > �[22m/dashboard returns 200�[32m 174�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mDashboard�[2m > �[22m/dashboard contains agent or pipeline visualization markup�[33m 1379�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mAPI Health�[2m > �[22mGET /api returns a response (not 404)�[33m 963�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mAPI Health�[2m > �[22mPOST /api/pipeline/stream with no body returns 400�[32m 42�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mStatic Assets�[2m > �[22mhomepage has proper meta tags�[32m 58�[2mms�[22m�[39m
 �[32m✓�[39m tests/e2e/pipeline.test.ts�[2m > �[22mEventRelay E2E — Live Deployment�[2m > �[22mStatic Assets�[2m > �[22m/features page returns 200�[32m 117�[2mms�[22m�[39m

�[2m Test Files �[22m �[1m�[32m1 passed�[39m�[22m�[90m (1)�[39m
�[2m      Tests �[22m �[1m�[32m19 passed�[39m�[22m�[90m (19)�[39m
�[2m   Start at �[22m 22:34:56
�[2m   Duration �[22m 111.69s�[2m (transform 67ms, setup 0ms, import 88ms, tests 111.47s, environment 0ms)�[22m


@github-actions github-actions Bot added documentation Improvements or additions to documentation python labels Sep 18, 2026
@github-actions

Copy link
Copy Markdown
Contributor

🔍 PR Validation

⚠️ PR title should follow conventional commits format

@github-actions

Copy link
Copy Markdown
Contributor

Dependency Review Summary

The full dependency review summary was too large to display here (10962KB, limit is 1024KB).

Please download the artifact named "dependency-review-summary" to view the complete report.

View full job summary

This branch was successfully deployed

1 active deployment
Preview 11502383 Deployed Sep 18, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

documentation Improvements or additions to documentation python

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Add evidence-backed sprint demo agenda for UVAI Home-to-Studio

3 participants