Reliability engineering tools, open source, for students through to practising professionals.
RePyability builds and analyses systems as reliability block diagrams (RBDs),
taking already-fitted lifetime models (from
surpyval or anything exposing
sf/ff) as its components:
- Fault trees: static fault trees (OR, AND and VOTE gates, repeated events) evaluated exactly, with common-cause groups, cut sets, importance measures, the mean time to the top event, B-lives and hazard, parameter sensitivities, uncertainty from fitted event models, and conversion to and from block diagrams; NOT gates (exact, with prime implicants), dynamic gates (priority AND, cold, warm and hot spares, sequences and functional dependencies: the top event probability over time, integrated where each is an independent module, simulated otherwise), and export to Open-PSA.
- Reliability: exact system reliability, hazard and conditional survival; the exact MTTF (or simulated, with confidence intervals); BX life; uncertainty intervals on the reliability, MTTF, BX life and time to a reliability from uncertain (fitted) component models.
- Networks: undirected networks whose links fail: the exact reliability of the connection between two terminals, by a decision diagram that keeps meshed networks fast.
- Phased missions: missions through phases (take-off, cruise, landing), each with its own diagram over the same components: the exact mission reliability and the chance of failing in each phase.
- Importance: Birnbaum, improvement potential, RAW, RRW, criticality, Fussell–Vesely, structural importance and parameter sensitivity, on repairable systems in the long run or over time.
- Sensitivity, the Greeks: how far the system moves with each component (delta) and with each lever, a life, a repair, the maintenance or a crew; the shares of a change, which add up (differential importance); whether two improvements are complements or substitutes (gamma); which component is moving the availability now, and which caused the failures (theta, Barlow–Proschan); and whose parameter uncertainty widens the answer (vega).
- Live state: reliability, remaining life and importance given each component's current age, and covariate-dependent components.
- Redundancy and dependence: cold, warm and hot standby; repeated nodes; load sharing; junctions (a vote point that never fails); beta-factor and MGL common-cause groups, splitting a probability or a failure rate, in block diagrams, repairable systems and fault trees.
- Repairable systems: exact long-run availability, failure frequency and MUT/MDT/MTBF; exact availability over time and over a mission, and the unavailability to its own precision (a PFD of 1e-17); simulated histories with criticality measures; shared repair crews, exact for exponential components in the long run and numerical over time, with their importance; repairable standby groups (a duty unit and its spares, repaired one at a time); imperfect repair (Kijima's virtual age), with replacement at the N-th failure; repair again or replace for a fleet whose units differ (a joint frailty model of repairs and write-offs: the best rule for a new unit, and each unit's decision from its frailty); and uncertainty intervals on the availability and the cost rate from uncertain (fitted) models of the lives, repairs and maintenance.
- Capacity: how much a system delivers, from its components' capacities (with several levels, or degrading through stages): the exact distribution of its capacity at a time or in the long run, the probability of meeting a demand, and the production availability.
- Spares: how many spares each component uses over a horizon, for a system or a fleet, and the stock that meets a fill rate or a stock-out target for a replenishment lead time, with interchangeable components' spares pooled on one shelf.
- Timelines: up/down histories, from outage logs or simulated, with their measures (time up, failures and who caused them, first failure); merged as a diagram's structure, so a system's history follows from its components', with the component behind each of its outages.
- Schedules on the calendar (
repyability.schedule): which dates a rule gives (every so many days, weeks, months or years; named weekdays; the first Saturday or the last Friday of the month; the first Tuesday of November every year; given dates; with seasons and excluded dates), and when tasks fall due on them, with two limits, crew visits, and the work by month. Plain data in and out, no clock read. - Simulation: seeded Monte-Carlo run to a tolerance, antithetic pairs, control variates from the system's exact twin, parallel runs, runs split across machines and merged, or sharded through any executor (Ray, Dask, a batch system), comparisons of designs with common random numbers, and small failure probabilities by rare-event simulation (subset simulation, cross-entropy importance sampling); repairable systems simulated compiled, with numba installed.
- Cost, design and maintenance: exact and simulated running costs, including scheduled (age or block) preventive replacement at system level, replacement on condition at periodic inspections (by age or by a measured level), opportunistic maintenance of grouped components at each other's stops, shutdowns, preventive maintenance that restores a unit only partly, and tasks counted in running hours, with the downtime split into planned and unplanned, with its intervals chosen for a cost or availability target, hidden failures found by periodic inspection, with the test intervals chosen for a PFDavg target, the total cost of ownership, discounted to a present value from new or in the long run, optimal redundancy allocation (for the lowest total cost of a repairable system, too, with whole trains given copies together), reliability allocation by the classic named methods (equal and ARINC-style apportionment, minimum effort, cost-based), availability allocation to MTTF and MTTR targets, and age-replacement and overhaul policies.
- Saving: diagrams to and from JSON, seeded results that repeat, and
every result as plain data (
to_dict(), ready forjson.dumps).
import surpyval as surv
from repyability import NonRepairableRBD
rbd = NonRepairableRBD(
[("s", "pump1"), ("s", "pump2"), ("pump1", "valve"), ("pump2", "valve"), ("valve", "t")],
{
"pump1": surv.Weibull.from_params([100, 2]),
"pump2": surv.Weibull.from_params([100, 2]),
"valve": surv.Weibull.from_params([200, 1.5]),
},
)
rbd.sf(50) # 0.839: system reliability at t = 50
rbd.birnbaum_importance(50) # which component matters mostNew to reliability engineering? The documentation includes Learn, a short course that teaches system reliability from a single part's lifetime to designing and maintaining whole systems, working every idea out by hand and then with RePyability, with exercises and worked answers.
RePyability needs Python 3.11 or later. Install it from PyPI:
pip install repyabilityRepairable systems simulate about ten times as fast with the optional compiled engine, which needs numba (available for 64-bit Linux, macOS on Apple silicon and Windows):
pip install "repyability[fast]"The analyses each model type has, and how each family of them is worked
out for each kind of node or component: the gaps are where a cell says
— or ✗. The tables are made from the code (python -m repyability.tests.capabilities writes them, and a test checks they are
current).
Which analyses each model type has (the method; — where it has none):
NonRepairableRBD |
RepairableRBD |
FaultTree |
Network |
PhasedMission |
|
|---|---|---|---|---|---|
| Reliability and lifetime | |||||
| Reliability R(t) | sf |
— | sf |
sf |
sf |
| Unreliability F(t) | ff |
— | ff |
ff |
ff |
| Density, hazard, cumulative hazard | df |
— | df |
— | — |
| Mean time to (first) failure | mean |
— | mean |
mean |
— |
| Each node's own R(t), F(t) and MTTF | node_sf |
— | — | — | — |
| B-life, time to a reliability | bx_life |
— | bx_life |
bx_life |
— |
| Given the system's age | cs |
— | — | — | — |
| Given the components' ages or states | sf_given_state |
— | — | — | — |
| Mean residual and remaining life | mean_residual_life |
— | — | — | — |
| Random lifetimes | random |
— | random |
random |
— |
| Top event probability | — | — | top_event_probability |
— | — |
| Each phase's failure probability | — | — | — | — | phase_failure_probabilities |
| Reliability over a mission's time | — | — | — | — | reliability_over_time |
| A mission's results from one run | — | — | — | — | summary |
| Availability and outages | |||||
| Reliability and mean time to the first failure | — | first_failure_sf |
— | — | — |
| Long-run availability | — | mean_availability |
— | — | — |
| Each node's availability | — | node_availability |
— | — | — |
| Availability over time | — | point_availability |
— | — | — |
| Over a mission | — | mission_availability |
— | — | — |
| Unavailability (precise when small) | — | mean_unavailability |
— | — | — |
| Failure frequency, MTBF | — | system_failure_frequency |
— | — | — |
| Mean up and down times | — | mean_up_time |
— | — | — |
| Expected failures and events in a window | — | expected_events |
— | — | — |
| Simulated availability (distribution) | — | availability |
— | — | — |
| Simulated histories | — | simulate_timelines |
— | — | — |
| Each simulation's values, common random numbers | — | simulation_samples |
— | — | — |
| Repair crews' jobs and chain | — | crew_jobs |
— | — | — |
| Compare two designs | compare |
compare |
— | — | — |
| Costs and spares | |||||
| Long-run cost rate | — | expected_cost_rate |
— | — | — |
| Expected cost in a window | — | expected_cost |
— | — | — |
| Expected net present value | — | expected_npv |
— | — | — |
| A plan against what happened | — | plan_vs_actual |
— | — | — |
| Simulated net present value (distribution) | — | npv_distribution |
— | — | — |
| Best time to switch blocks' running (simulated NPV) | — | best_switch_time |
— | — | — |
| Two plans' net present values compared | — | compare_npv |
— | — | — |
| Least spend for a bad run's downtime (simulated) | — | least_spend_for_downtime |
— | — | — |
| Cost in each of a run of windows | — | cost_by_window |
— | — | — |
| Simulated cost (distribution) | — | cost |
— | — | — |
| Total cost of ownership | — | total_cost |
— | — | — |
| Each component's actions per unit time | — | node_action_rates |
— | — | — |
| A replaced component's renewal cycle | — | replacement_cycle |
— | — | — |
| Planned and unplanned downtime, failures the plan avoids | — | maintenance_effect |
— | — | — |
| Spares demand and stock | — | spares_demand |
— | — | — |
| Structure | |||||
| Minimal path and cut sets | minimal_cut_sets |
minimal_cut_sets |
minimal_cut_sets |
minimal_cut_sets |
minimal_cut_sets |
| Prime implicants (NOT gates) | — | — | prime_implicants |
— | — |
| Each path set's probability | path_set_probabilities |
path_set_probabilities |
— | — | — |
| Cut sets ranked by probability | — | — | ranked_cut_sets |
— | — |
| Irrelevant components | find_irrelevant_components |
find_irrelevant_components |
— | — | — |
| Structure sizes (counts, depth, core) | structure_summary |
structure_summary |
— | — | — |
| The core that does not reduce | core_structure |
core_structure |
— | — | — |
| Junctions (drawing nodes) | junctions |
junctions |
— | — | — |
| Convert to and from an RBD | — | — | to_rbd |
— | from_diagram |
| Capacity distribution | capacity_distribution |
capacity_distribution |
— | — | — |
| Capacity over time | — | point_capacity |
— | — | — |
| How each analysis is computed | analysis_routes |
analysis_routes |
analysis_routes |
analysis_routes |
analysis_routes |
| Save and load (dict, JSON) | to_dict |
to_dict |
to_dict |
to_dict |
— |
| Export to Open-PSA (MEF) | — | — | to_open_psa |
— | — |
| Importance measures | |||||
| Birnbaum | birnbaum_importance |
birnbaum_importance |
birnbaum_importance |
birnbaum_importance |
birnbaum_importance |
| Structural | structural_importance |
structural_importance |
structural_importance |
structural_importance |
— |
| Improvement potential | improvement_potential |
improvement_potential |
improvement_potential |
improvement_potential |
improvement_potential |
| Risk achievement worth | risk_achievement_worth |
risk_achievement_worth |
risk_achievement_worth |
risk_achievement_worth |
risk_achievement_worth |
| Risk reduction worth | risk_reduction_worth |
risk_reduction_worth |
risk_reduction_worth |
risk_reduction_worth |
risk_reduction_worth |
| Criticality | criticality_importance |
criticality_importance |
criticality_importance |
criticality_importance |
criticality_importance |
| Fussell-Vesely | fussell_vesely |
fussell_vesely |
fussell_vesely |
fussell_vesely |
fussell_vesely |
| Differential (DIM) | differential_importance |
differential_importance |
differential_importance |
differential_importance |
— |
| Joint (second order) | joint_importance |
joint_importance |
joint_importance |
joint_importance |
— |
| Barlow-Proschan | barlow_proschan_importance |
barlow_proschan_importance |
barlow_proschan_importance |
barlow_proschan_importance |
— |
| Shares of a safety function's PFDavg, common cause apart | — | pfd_breakdown |
— | — | — |
| Each block's part in each phase's failures | — | — | — | — | failure_drivers |
| Rate of change over time | reliability_rate |
availability_rate |
— | — | — |
| Uncertainty importance | uncertainty_importance |
uncertainty_importance |
— | — | — |
| All measures given a state | importances_given_state |
— | — | — | — |
| Top event given each event | — | — | conditional_probabilities |
— | — |
| Parameter sensitivity, levers | parameter_sensitivity |
parameter_sensitivity |
parameter_sensitivity |
— | — |
| Uncertainty | |||||
| Of the reliability or availability | sf_uncertainty |
mean_availability_uncertainty |
sf_uncertainty |
sf_uncertainty |
reliability_interval |
| Of the MTTF | mean_uncertainty |
— | mean_uncertainty |
mean_uncertainty |
— |
| Of the B-life | bx_life_uncertainty |
— | — | — | — |
| Of the cost rate | — | expected_cost_rate_uncertainty |
— | — | — |
| Of the net present value | — | expected_npv_uncertainty |
— | — | — |
| Design and maintenance | |||||
| Reliability allocation | simple_allocation |
simple_allocation |
— | — | — |
| Availability, MTTF and MTTR allocation | — | availability_allocation |
— | — | — |
| Redundancy allocation | allocate_redundancy |
allocate_redundancy |
— | — | — |
| Reliability-redundancy allocation | allocate_reliability_redundancy |
— | — | — | — |
| Cost-reliability front | redundancy_front |
— | — | — | — |
| Optimal replacement intervals | — | optimal_replacement_intervals |
— | — | — |
| Optimal proof-test intervals | — | optimal_inspection_intervals |
— | — | — |
How each family of analyses is worked out on a diagram with each kind of node or component: E exact, N numerical (to a stated accuracy), S simulated, ✗ refused as not worked out (naming the methods, or counting them, where only some are), – where the diagram has nothing the analysis works on. Made from analysis_routes() on the test catalogue's diagrams.
NonRepairableRBD, by node
| Reliability | MTTF | B-life | Given a state | Importance | Sensitivity | Uncertainty | Allocation | Capacity | Simulation | |
|---|---|---|---|---|---|---|---|---|---|---|
| A surpyval model | E | N | N | E N | E N | N | S | E N | – | S |
| A fitted model (with its covariance) | E | N | N | E N | E N | N | S | E N | – | S |
| A fit with a cure share and zero-inflation | E | N | N | E N | E N | N | S | E N | – | S |
| A probability per demand | E | – | – | E | E | N | S | E N | – | S |
A mixture (MixtureModel) |
E | N | N | E N | E N | N | S | E N | – | S |
| A regression node (covariates) | E | N | N | E N | E N | N | S | E N | – | S |
| A joint model's unit, given its readings | N | N | N | N | N | N | S | N | – | S |
| A degrading node | N | N | N | N | N | N | S | N | N | S |
| A fitted degradation process | E | N | N | E N | E N | N | S | E N | – | S |
| Cold standby (convolved) | N | N | N | N | N | N | S | N | – | S |
| Standby with no reliability of its own | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | N; ✗ allocate_redundancy |
– | S |
| Load sharing | E | N | N | E N | E N | N | S | E N | – | S |
| A repeated node | E | N | N | E N | E N | N | S | E N | – | S |
| A repeated standby node | N | N | N | N | N | N | S | N | – | S |
| A nested RBD | E | N | N | E N | E N | N | S | E N | – | S |
| A junction | E | N | N | E N | E N | N | S | E N | – | S |
| A beta-factor common-cause group | E | ✗ | N | ✗ | E N | N | S; ✗ mean_uncertainty |
E N | – | S |
| An MGL common-cause group | E | ✗ | N | ✗ | E N | N | S; ✗ mean_uncertainty |
E N | – | S |
| An alpha-factor common-cause group | E | ✗ | N | ✗ | E N | N | S; ✗ mean_uncertainty |
E N | – | S |
| Capacities | E | N | N | E N | E N | N | S | E N | E | S |
| A structure too meshed to work out | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | – | S |
RepairableRBD, by component
| Long run | Frequency | Over time | Costs | Importance | Sensitivity | Uncertainty | Allocation | Intervals | Spares | Capacity | Simulation | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Any life and repair | E | E | N | E N | E N | N | S | E | – | N | – | S |
| A fitted life | E | E | N | N | E N | N | S | E | – | N | – | S |
| A fitted Crow-AMSAA process | ✗ | ✗ | N | N; ✗ expected_cost_rate |
N; ✗ 10 of 11 | ✗ | S; ✗ mean_availability_uncertainty, expected_cost_rate_uncertainty |
✗ | – | ✗ | ✗ capacity_distribution |
S |
| A fitted G1, ARA or ARI process | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | – | ✗ | ✗ capacity_distribution |
S |
| A probability per demand | ✗ | ✗ | ✗ | ✗ expected_npv |
✗ | ✗ | ✗ mean_availability_uncertainty, expected_npv_uncertainty |
✗ | – | N | ✗ capacity_distribution |
S |
| A mixture life | E | E | N | E N | E N | N | S | E | – | N | – | S |
| A fitted degradation process life | E | E | N | N | E N | N | S | E | – | N | – | S |
| Operated part of the time (duty) | N | N | N | N | N | N | S | N | – | N | – | S |
| Tasks counted in running hours (duty) | N | N | N | N | N | N | S | N | N | N | – | S |
| A standby or load-sharing life, simulated | ✗ | ✗ | ✗ | ✗ expected_npv |
✗ | ✗ | ✗ mean_availability_uncertainty, expected_npv_uncertainty |
✗ | – | ✗ | ✗ capacity_distribution |
S |
| k-out-of-n | E | E | N | N | E N | N | S | E | – | N | – | S |
| A nested RBD | E | E | N | E N | E N | N | S | E | – | – | – | S |
| A junction | E | E | N | E N | E N | N | S | E | – | N | – | S |
| Capacities | E | E | N | N | E N | N | S | E | – | N | E N | S |
| Age replacement | N | N | N | N | N | N | S | N | N | N | – | S |
| Block replacement | N | N | N | N | N | N | S | N | – | N | – | S |
| Opportunistic maintenance | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ optimal_replacement_intervals |
✗ | ✗ capacity_distribution |
S |
| Replacement on condition | N | N | N | N | N | N | S | N | – | ✗ | – | S |
| Replacement on condition by level | N | N | N | N | N | N | S | N | – | ✗ | – | S |
| Hidden failures, tested | N | N | N | N | N | N | S | N | – | N | – | S |
| Tests that take time | N | N | N | N | N | N | S | N | – | N | – | S |
| Tests that can miss a failure | N | N | N | N | N | N | S | N | – | N | – | S |
| Imperfect repair (Kijima) | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | – | ✗ | ✗ capacity_distribution |
S |
| Minimal repair | ✗ | ✗ | N | N; ✗ expected_cost_rate |
N; ✗ 10 of 11 | ✗ | S; ✗ mean_availability_uncertainty, expected_cost_rate_uncertainty |
✗ | – | ✗ | ✗ capacity_distribution |
S |
| Minimal repair, repairs that take time | ✗ | ✗ | N | N; ✗ expected_cost_rate |
N; ✗ 10 of 11 | ✗ | S; ✗ mean_availability_uncertainty, expected_cost_rate_uncertainty |
✗ | – | ✗ | ✗ capacity_distribution |
S |
| Limited repair crews | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ | – | ✗ | ✗ capacity_distribution |
S |
| A standby group | E | E | N | E N | E N | N | S | E | – | ✗ | – | S |
| A beta-factor group, revealed failures | E | E | N | N | E N | N | S | E | – | N | – | S |
| A beta-factor group, tested | E | E | N | E N | E N | N | S | E | – | N | – | S |
| An alpha-factor group, revealed failures | E | E | N | N | E N | N | S | E | – | N | – | S |
| A group whose tests take time | N | N | N | N | N | N | S | N | – | N | – | S |
| A structure too meshed to work out | ✗ | ✗ | ✗ | E; ✗ expected_cost, expected_npv |
✗ | ✗ | S; ✗ mean_availability_uncertainty, expected_npv_uncertainty |
✗ | – | N | – | S |
RePyability computes exactly by default: by closed forms, or by deterministic numerical methods (quadrature, convolution, renewal equations) that give the same answer every run, to a small stated error. It simulates only when
- the answer is itself random: sampled lifetimes or histories, or the spread of an outcome over a window (a cost's percentiles, how many failures);
- components depend on each other in a way no exact method solves in general; or
- an exact method could exist but has not been written yet.
Exact or numerical, in any architecture (series, parallel, k-out-of-n, bridges and other meshed diagrams, components in several places, nested diagrams):
- components: surpyval lifetime distributions, degradation processes
(Wiener and gamma, as the time to their threshold) and fixed
probabilities (a diagram refuses a non-parametric fit, such as
Kaplan–Meier: fit a parametric distribution in surpyval); a unit of a
surpyval joint model of readings and failures, given its readings
(
JointNode, from now); repeated nodes; standby of Exponential units (any number operating, any dormancy); cold standby with one or two units operating (any units) or more (identical units); warm standby with one unit operating, and hot standby (any units); spares that may fail to switch in or to start, in each of these; load sharing of identical units; common-cause groups, for the system's reliability, importance, sensitivity and redundancy allocation (and, splitting the failure rate, its MTTF and the analyses given its members' one age: wear-out lives and ages); - non-repairable questions: reliability, hazard, MTTF, BX life and importance measures at any time, also given each component's current age; the distribution of the system's capacity;
- repairable questions, for independent components repaired when they fail, replaced on age or block schedules or on condition at inspections, or tested for hidden failures (any life, the tests and repairs instant or taking time, the tests finding every failure or missing some): the long-run availability, failure frequency, MUT/MDT/MTBF and cost rate; the availability over time and over a mission, and the expected failures, outages, downtime and cost over a window, from new or from the components' current states (their ages, the repairs going on, where they are in their calendars, or the long run); the capacity distribution in the long run and over time, with the production availability of a window; and the spares used over a horizon, and the stock to hold for a lead time (under block replacement, with repairs and block replacements in no time). Common-cause groups of members with exponential lives, tested or repaired, take nothing away: the long-run values, importance and allocations stay exact, and the values over time from new numerical.
Simulated, or refused with the simulation to run instead:
| Situation | Today | Must it be simulated? |
|---|---|---|
| What you ask | ||
| Sampled lifetimes or histories, and distributions or percentiles of an outcome over a window | Simulated (from new, or from the components' current states); each simulation's histories, the system's and its components', kept whole as timelines by simulate_timelines (from new) |
Yes: the answer is a sample. Its mean over a window (failures, outages, downtime, cost, the capacity delivered) is exact, from new or from a state: expected_events, expected_cost, mission_capacity. |
Comparing two designs (compare) |
Exact where both designs' expected values are (their MTTFs; a repairable system's mission availability and expected cost), with no simulation (#236); otherwise, or on request (method="simulate", control_variate=False), simulated with common random numbers |
Only where a design's own values are simulated. |
The uncertainty from fitted component parameters (sf_uncertainty, mean_uncertainty, bx_life_uncertainty, time_to_reliability_uncertainty; for a repairable system mean_availability_uncertainty, point_availability_uncertainty, mission_availability_uncertainty, expected_cost_rate_uncertainty) |
Sampled over the parameters, randomly or quasi-randomly (sampling="sobol"), each draw exact or numerical as the diagram's own value is |
Sampling is the method. |
| Small failure probabilities, with a node only simulations take | Rare-event simulation (unreliability_interval); ff refused |
Only while the node has no reliability of its own: an exact diagram gives ff directly, to full precision however small (a numerical node, such as a cold-standby group of non-exponential units, to its own accuracy, about 1e-6). |
| Components | ||
| Warm standby with two or more units operating, of non-exponential units | Simulated in the system's simulations; the analyses that need the group's reliability refused | Yes, in general: which spare is switched in where, and how much each has aged, branch with the order of the failures. With one unit operating it is numerical, hot standby (k-out-of-n) exact, and Exponential units exact (a Markov chain), spares that may fail to switch in or start included. |
| Cold standby with three or more different units operating, and load sharing of different units | Simulated in the system's simulations; the analyses that need the group's reliability refused | Yes, in general: which spare goes where, and how old the others are, branch with the order of the failures. Identical units are numerical in both, and so are two different units operating; Exponential units in standby are exact. |
| Anything such a node is part of | Simulated in the system's simulations; the analyses that need the node's reliability refused | Only while the node has no reliability of its own. |
| Common-cause groups: analyses given ages for members of different ages or a group splitting a failure probability, and the MTTF of such a group | Refused (a simulated MTTF leaves a probability split out) | No. A group splitting the failure rate (basis="rate") is exact given its members' one age, as a share of their hazard is one hazard only then, and a shock at its own rate that fails members of any lives and ages is an exponential node in series with them, and shock_nodes writes out shocks that fail each member with a probability (the guide). A group splitting the failure rate has an exact MTTF, and the simulations draw its shared shocks. Importance, parameter sensitivity and redundancy allocation are exact with groups (a beta-factor member's copies join its group), and parameter uncertainty is sampled with them. |
| Architecture and maintenance | ||
| Phased missions and networks too large for their decision diagrams | Refused, pointing to method="simulate" |
Only in practice: the diagrams grow with the phases' and the network's width rather than their paths, so meshed missions and networks are exact (a network grid of 100 nodes in a second and a half); one of 121 nodes passes the limit, repyability.network.MAX_STATES, which can be raised. |
| Block diagrams too meshed for their decision diagrams | Simulated (lifetimes, availability, cost and timelines, in Python); the exact and numerical analyses refused | Only in practice: the diagram grows with how wide the mesh is rather than with its paths, so most meshes are exact (a 10 × 10 grid in 0.04 seconds, a random mesh of 60 nodes and 345 links in 2); one of 70 nodes and 485 links passes the limit, repyability.rbd.bdd.STEP_LIMIT, which can be raised. |
| Common-cause groups in a repairable diagram | For exponential lives, tested or repaired: the long run, importance and the allocations exact (a beta-factor member's copies join its group, and the availability allocations keep the members' availability), and numerical where the members' tests and repairs take time (#220): a fixed or an exponential time exactly, any other length on pieces of the time since the test (#106); the values over time numerical (the groups' Markov chains), from new, from the members' states or from the long run (#106), and the simulations draw the shared causes, from new or from the members' states, in Python. Shocks at a rate of their own (Shocks: each failing each member with a probability, the members of any lives, each then repaired or found at its test on its own) are simulated, in Python, and the exact methods refuse them. Members of other lives in the groups that split the rate refused, as are copies of members whose tests or repairs take time, tests and repairs that can run into the next test, and members held |
Other lives: a shared cause has no one rate for members of different ages, so they need a model first. Shocks at their own rate are that model for members of any lives, simulated; their chain would need each member's age, so yes, in general. Without repairs, the guide has a second: a share of the hazard of members of one age. |
| Shared repair crews | For exponential lives and repairs, the long run and importance exact, and the values over time numerical (the same Markov chain, followed by uniformization), and the redundancy allocation exact (each design's chain, its copies queueing for the crews), but the allocations of availability targets; common-cause groups whose causes strike two members in the same chain (more: simulated); other lives simulated. The maintenance and test intervals are chosen as if every repair started at once on request (assume_unlimited_crews=True), for a plan to simulate with the crews |
Other lives: yes, in general. |
| Standby groups (a duty unit and its spares, repaired) | For exponential units, the long run and importance exact, and the values over time numerical (the units' Markov chain, followed by uniformization); other units simulated | Other units: yes, in general. |
| Opportunistic maintenance (renewals at a group's stops) | Simulated | Yes: each member's renewals depend on the others' ages. |
| Imperfect repair (Kijima), with or without replacement at the N-th failure | Simulated; but minimal repair (q = 1, or a fitted Crow-AMSAA, Duane or Cox-Lewis process) is numerical over a window from new, and its long run, replaced at the N-th failure or at an age, is exact (a renewal cycle; Cox-Lewis's with a failure limit by quadrature, #402); without a replacement its long run is refused |
Yes, in general: a repair does not renew the unit. Minimal repair's values over time with replacement could be numerical, as a renewal of its cycle. |
| Preventive maintenance that restores a unit only partly (Kijima), with or without replacement at every N-th task | Simulated (availability, cost, timelines and the spares used, in Python), from new or from the unit's virtual age; the exact and numerical analyses refused | Yes, in general: a task does not renew the unit, so its failures are not a renewal process's. |
| Shutdowns: outages that hold the system or some blocks off line for a fixed time, the blocks' work done in them | On a period, over blocks that fail independently: exact or numerical as the blocks' own values are (the long run, the values over time, the expected events, costs and NPV), "older than" numerical; the simulations follow the windows, in Python. At given times (outages on a timeline), the same over a horizon where the blocks worked on are renewed at each, or kept unless due (numerical, stretch by stretch), and no long run (refused: the outages end); so too a block renewed at several shutdowns, each renewal its own shut's length. With a restoration at a shut, a block tested at given times, or with blocks tied together (crews, common causes, maintenance groups): simulated. The importance measures, capacities, first failure, spares, allocations, parameter uncertainty and interval searches refused for now | A block tested at given times: no, its recursion could take the times as the renewed and the kept block's do. A restoration: yes (the unit's virtual age is not a renewal's). The rest are not taken in yet. |
Planned against unplanned downtime, and the failures a plan avoids (maintenance_effect) |
Exact or numerical where the diagram's and its run-to-failure twin's values over a window are, over blocks that fail independently: each block's probability of having failed over time, beside its downtime, from its curve (maintenance and timed tests at age or on a calendar, shuts on a period or at given times, nested RBDs), in the long run too (where there is one); the simulations follow it path by path, on both engines. With planned outages and limited repair crews or common-cause groups, or with partial restoration: simulated | Crews and common-cause groups, no: their chains could keep a block in planned work apart from one in a repair, as a single block's curve does. |
| Replacement on condition by a measured degradation level | Numerical, from new, from a state (a level measured now, new on its calendar, or in a repair or replacement) and in the long run: the values over time and the long run follow the level's distribution on a grid of levels from one inspection to the next, as replacement on condition by age follows ages; the simulations (in Python) give the spread | No: between inspections the level is a Markov process. |
| Spares with repair crews, standby groups, opportunistic maintenance, imperfect repair or partial restoration | Refused, pointing to spares_demand(method="simulate"). Otherwise numerical, demand and stock: block-replaced components' whether their repairs and block replacements take time or not (from a typical replacement in the long run), but for one dead on arrival while they may take none, and tested components', whatever their tests and repairs take and whether their tests miss failures |
Yes, in general: a crew's queue, a group's switching or stops, an imperfect repair and a partial restoration make the replacements depend on more than each unit's own lives. A unit dead on arrival whose renewals may take no time: no, the replacements at one instant could be counted. |
Where a system's expected values over a window are exact,
availability() and cost() give them by default, with no error, and the
simulations give their spread. Where a system needs simulating for a few of
its nodes (a standby group of other lives, a nested RBD sharing a crew, a
unit repaired imperfectly or restored partly by its maintenance), their mean intervals by default take each
simulation's expected values given those nodes' histories, every other node
exact given their states: a fraction of the error of the simulations' own.
conditional=True simulates only those nodes, for the same means in less
time.
For your own diagram, analysis_routes() says how each analysis will be
computed (exact, numerical, simulated or refused) and why, without running
anything; a refusal's message names the simulation to run instead. The
guide
lists every method's route.
The full documentation — tutorial, user guide, concepts and API reference — is hosted at derrynknife.github.io/RePyability.
It is built with MkDocs from the sources in docs/
and mkdocs.yml, and published to GitHub Pages on every push to main. To
build and serve it locally:
pip install -e .[docs]
mkdocs serve # then open http://127.0.0.1:8000The source lives in docs/ and mkdocs.yml; start with docs/index.md.
stories/ holds the questions users and agents should
be able to answer with RePyability, with how we will know they are answered.
Questions and bug reports are welcome in the
issue tracker.
Reliafy is a hosted, browser-based app built on RePyability and SurPyval, for building reliability block diagrams and analysing their reliability and availability without writing code.
See CONTRIBUTING.md: setting up, the checks a change
needs (scripts/check.sh), and the parts of the package that must agree
with each other.