Repository navigation
test: stabilize resume polling boundary under CI load - #20
Merged
Merged
Conversation
AnsonDev42
marked this pull request as ready for review
November 11, 2026 23:06
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
The resume-polling test assumed the initial materialization slice always reached exactly 1,000 rows. On a busy Python 3.12 tag runner, the time budget correctly flushed 999 rows first, causing a false assertion failure. A controlled clock reproduced the same failure against both the pre-review base and the released runtime.
Pin this test's work-slice clock so its count-boundary and poll-before-materialize assertions are deterministic; retain separate time-budget tests and the real polling clock. Document the testing rule. Runtime code, version metadata and the published v0.0.8 tag remain unchanged.
Proof
uv run pytest -q: 345 passed, 9 skipped; coverage gate retained.