Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
17 changes: 15 additions & 2 deletions astro.config.mjs
Original file line number Diff line number Diff line change
@@ -1,5 +1,18 @@
import { unified } from '@astrojs/markdown-remark';
import v3Links from './scripts/remark-v3-links.mjs';
import { defineConfig } from 'astro/config';
export default defineConfig({ srcDir: './site/src', markdown: { processor: unified({ remarkPlugins: [v3Links] }) }, site: 'https://and-gu.github.io',
base: '/executable-engineering-lab', trailingSlash: 'always', output: 'static' });

const base = '/executable-engineering-lab';
const wrapUp = base + '/learn/v3/14-from-engineering-intent-to-continuous-integration/';
export default defineConfig({
srcDir: './site/src',
markdown: { processor: unified({ remarkPlugins: [v3Links] }) },
site: 'https://and-gu.github.io',
base,
trailingSlash: 'always',
output: 'static',
redirects: {
'/learn/v3/14-managing-engineering-knowledge-at-scale': wrapUp,
'/learn/v3/15-choosing-the-next-engineering-capability': wrapUp,
},
});
15 changes: 6 additions & 9 deletions project/CURRICULUM-MAP.md
Original file line number Diff line number Diff line change
@@ -1,10 +1,8 @@
# V3 curriculum map — proposed 15-chapter sequence, four parts
**Editorial update (17 November 2026):** New Chapter 2 introduces the fictional four-way intersection after an executive-level Chapter 1. The former Chapters 2–14 become Chapters 3–15. This change is proposed in a review PR and explicitly requested for publication by the owner.
# V3 curriculum map — fourteen chapters in four parts
The four-part course follows the intersection team from an engineering question to an integrated product and its release decision. Chapter 14 brings those decisions together.

**Single case:** One fictional four-way traffic intersection, introduced in Chapter 2 and used for the technical progression. Chapter 1 stands alone as the engineering-paradigm overview.

**Title status:** The proposed capstone title *Choosing the Next Engineering Capability* appears in the owner-accepted fourteen-chapter plan. Retain the existing Chapter 07 title *Spec-Driven Development Without Waterfall* for now; the independent review's alternative *Specifying the Next Engineering Increment* remains a separate editorial naming decision. Older 13-chapter text remains preserved as source material and must not be silently renumbered.

| Part | # | Chapter | Distinct learning gain | Primary intersection teaching view |
|---|---:|---|---|---|
| I — Frame the Work | 01 | The New Engineering Paradigm | Decide where earlier feedback could save engineering time and reduce rework | Compare a product change with the repeatable check that helps teams integrate it |
Expand All @@ -20,16 +18,15 @@
| III | 11 | Reviewing an Integrated Product Change | Review compatible changes and decide which claims the available evidence supports | Follow a connector change across disciplines and inspect the two proposed interface revisions |
| IV — Establish Trust and Sustain Change | 12 | Governance and Engineering Authority | Allocate authority for routine work and identify the product decision a human must own | Trace a delegated investigation to a decision on controller and adapter compatibility |
| IV | 13 | Continuously Integrated Engineering | Decide when an integrated product and its service material can be released together | Follow a diagnostic change through software, translations, logistics and training |
| IV | 14 | Managing Engineering Knowledge at Scale | Reuse sources, models, tests and working methods with judged applicability | Cross-variant compatibility |
| IV | 15 | Choosing the Next Engineering Capability | Synthesize the two-system story into an investment decision | Choose next engineering capability |
| IV | 14 | From Engineering Question to Useful Release | Decide which engineering capability can turn early learning into a complete, releasable change | Connect provisional information, agent work, independent feedback and whole-product release |

**This is an educational progression, not a waterfall process.** Integration, verification, security, assurance and risk reasoning are relevant from the earliest stages, although their detailed lessons appear later.

**Migration and status:** See [chapter migration map](v3/CHAPTER-MIGRATION-13-TO-14-2026-11-16.md), [editorial manuscript index](v3/manuscripts/INDEX.md), [independent assessment](v3/reviews/INDEPENDENT-FULL-COURSE-REVIEW-2026-11-16.md), and [P0 worked-case package](v3/reviews/WORKED-CASE-REVISION-PACKAGE-2026-11-16.md).
**Migration and status:** The [active manuscript index](v3/manuscripts/revised/INDEX.md) identifies the two retired manuscripts. For earlier editorial decisions, see the [chapter migration map](v3/CHAPTER-MIGRATION-13-TO-14-2026-11-16.md), [editorial manuscript index](v3/manuscripts/INDEX.md), [independent assessment](v3/reviews/INDEPENDENT-FULL-COURSE-REVIEW-2026-11-16.md), and [P0 worked-case package](v3/reviews/WORKED-CASE-REVISION-PACKAGE-2026-11-16.md).

## Terminology and introduction sequence

The owner approved this terminology direction on 15 November 2026 during the front-page review. These are editorial definitions for the tutorial; the chapter sequence and future demonstrations remain planned. Systems engineering establishes the scope, executable engineering describes the approach, and AI agents are one capability within it.
The owner approved this terminology direction on 15 November 2026 during the front-page review. These editorial definitions guide the course and its proposed demonstrations. Systems engineering establishes the scope, executable engineering describes the approach, and AI agents are one capability within it.

| Term | Meaning and usage in this tutorial | Introduce and develop |
|---|---|---|
Expand All @@ -54,7 +51,7 @@ The systems scope follows [INCOSE's systems engineering definition](https://www.
- **03→04→05→06:** Planning requires connected information; controlled models generate bounded results; data quality determines what conclusions hold.
- **06→07→08→09:** Evidence informs specifications and agent work, which can produce reviewable changes.
- **09→10→11→12:** A software increment must reach integrated-product evidence and accountable engineering authority.
- **12→13→14→15:** Release eligibility, continuous engineering and reuse support a decision about the next engineering capability.
- **12→13→14.** The release lead assesses the whole product. The wrap-up follows the evidence behind that decision and asks what the next project can reuse.

The order is educational; real product teams address assurance, safety, integration and security from the start.

Expand Down
59 changes: 59 additions & 0 deletions project/v3/learning/quizzes/eel-v3-ch14-course-wrap-up.json
Original file line number Diff line number Diff line change
@@ -0,0 +1,59 @@
[
{
"id": "promote-learning-into-delivery",
"prompt": "A team uses an agent to create a disposable software interface while the product definition is still open. The prototype exposes a behavior that matters. What should happen before that learning governs delivery?",
"options": [
{
"text": "Promote the generated interface directly after stakeholders agree that the demonstration looks useful.",
"feedback": "The demonstration can reveal a useful question, but appearance alone does not establish the governing behavior, configuration or evidence for delivery."
},
{
"text": "Record the agreed behavior, assumptions and interfaces in versioned sources, identify the configuration and add an independent check.",
"correct": true,
"feedback": "The prototype can remain disposable. The selected learning becomes durable through maintained definitions, explicit configuration and feedback that can expose a mismatch."
},
{
"text": "Stop using prototypes until the team can write a complete specification for the whole product.",
"feedback": "The team can start learning with partial intent. It needs enough context for the next useful question, not complete information before any exploration."
}
]
},
{
"id": "expand-an-agentic-flow",
"prompt": "An agent can revise an interface definition and make a check it wrote from the same interpretation pass. What would justify expanding the delegated flow?",
"options": [
{
"text": "A larger set of generated changes, because producing more accepted output shows that the agent understands the product.",
"feedback": "More output can move the bottleneck into review and integration. It does not provide an independent basis for judging the interpretation."
},
{
"text": "Current governing sources, a sufficiently independent check, explicit permissions and an escalation path to the responsible decision-maker.",
"correct": true,
"feedback": "Those conditions let the agent adapt within a bounded task while people retain authority over exceptions, evidence quality and consequential product decisions."
},
{
"text": "A successful run of the agent's own check, provided the agent can explain why each change was necessary.",
"feedback": "An explanation and a check derived from the same mistaken interpretation may agree with each other. The flow needs independent feedback and clear authority boundaries."
}
]
},
{
"id": "improve-whole-product-release",
"prompt": "Software and electronics checks have passed, but a required service translation for the same change is still awaiting review. Which response supports faster whole-product release?",
"options": [
{
"text": "Release the technical artifacts now and attach the reviewed translation in a later service update.",
"feedback": "If users or technicians depend on the translation, the released configuration would be incomplete even though local technical checks passed."
},
{
"text": "Hold the incomplete candidate, then bring language review into the next change early enough to proceed alongside implementation and integration.",
"correct": true,
"feedback": "The current release still needs its complete package. Exposing the dependency earlier on the next change reduces waiting across the whole flow rather than optimizing one discipline."
},
{
"text": "Treat approval of the source-language instruction as evidence that every required edition is ready.",
"feedback": "The source review may be reusable input, but it does not establish that each required edition preserves the meaning for its users."
}
]
}
]
5 changes: 3 additions & 2 deletions project/v3/manuscripts/INDEX.md
Original file line number Diff line number Diff line change
@@ -1,6 +1,7 @@
# V3 Editorial Manuscript Index — Current Approved Curriculum
# V3 editorial manuscript index — November 2026 planning archive

The [active manuscript index](revised/INDEX.md) and [curriculum map](../../CURRICULUM-MAP.md) give the current reading order. This page preserves the earlier editorial assignments.

**Status:** Index and editorial review routing; no new V3 site pages published by this index
**Date:** 2026-11-15
**Tracking issue:** [#32 — V3 master plan](https://github.com/And-Gu/executable-engineering-lab/issues/32)

Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -74,7 +74,7 @@ If mismatches now surface early but the release still depends on timing under lo

> **Explore further**
>
> In Chapter 15, [compare four investments against the product decision they would support](15-choosing-the-next-engineering-capability.md#decide-from-what-is-blocking-the-product).
> [Revisit this investment in the final chapter](14-from-engineering-intent-to-continuous-integration.md). Which part of a check can another project reuse, and which observation must its team make again?

<!-- interactive: chapter-quiz -->

Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -95,6 +95,6 @@ What would you ask the team to bring back? For the display candidate that confir

<span id="who-can-accept-the-remaining-risk"></span>

“Building the machine that builds the machine” has a concrete payoff here. When the adapter definition changes again, the team can retrieve the earlier comparison, locate the affected display and test revisions, and give the reviewer the new evidence alongside the earlier decision. Chapter 13 follows the people who operate that environment, and the final chapter considers which capability to invest in next. [Operating the engineering environment](13-continuously-integrated-engineering.md#building-the-factory-is-engineering-work) · [Choosing the next engineering capability](15-choosing-the-next-engineering-capability.md).
“Building the machine that builds the machine” has a concrete payoff here. When the adapter definition changes again, the team can retrieve the earlier comparison, locate the affected display and test revisions, and give the reviewer the new evidence alongside the earlier decision. Chapter 13 follows the people who operate that environment. The final chapter asks which evidence a team can carry into its next change. [Operating the engineering environment](13-continuously-integrated-engineering.md#building-the-factory-is-engineering-work) · [Revisit the evidence in Chapter 14](14-from-engineering-intent-to-continuous-integration.md).

Could an agent retrieve the new definitions, repeat a check and retry an interrupted run on its own? Who gives it that authority, and whose decision is required before the team can accept the interface? [Chapter 12, Governance and Engineering Authority](12-governance-and-engineering-authority.md).
Original file line number Diff line number Diff line change
Expand Up @@ -75,3 +75,5 @@ For a closer look at when building and maintaining that environment pays off, re
## Make the whole-product decision

**Today the release lead holds the candidate.** Next week, if the language reviewer approves the service instruction, the team builds that edition into the package and checks that the display opens it for the right diagnostic. With the other evidence still applicable, the lead can record that the identified whole-product configuration is releasable. Operations can then select a deployment date. In this example the last required service instruction sets the earliest release date, and the missed one-day target tells the team exactly where to improve its next iteration.

On the next change, which parts of this work can the team reuse, and what does it have to observe again? [Follow the decisions through the course in Chapter 14](14-from-engineering-intent-to-continuous-integration.md).
Loading
Loading