Improvement requested in the Chapter 3 review
Build on the planning example already in Planning Under Uncertainty. Use the city's intersection to compare traditional waterfall planning with agile planning and to show why traceability matters as a plan changes. Give vision, initiative and increment the emphasis. Each expresses engineering intent at a different level. The backlog can have a short supporting role as the ordered work for the chosen increment. Current planning section
Show the two ways of tracing the same work
In the waterfall example, start with an agreed requirement. Follow it down into allocated work and back to the check that demonstrates fulfillment. Once a requirement is agreed, teams can use it to explain why a task belongs in the plan. If the requirement changes, its dependents can be identified and reviewed.
In the agile example, start with what the city wants to achieve while the requirements are still developing. Make the three levels recognizable in the existing case.
| Level | What intent does it express? | Intersection example |
|---|---|---|
| Vision | What lasting outcome do we want, and for whom? | Improve traffic flow while people can cross safely. |
| Initiative | Which part of that outcome are we working on now? | Understand how arrival timing affects vehicle queues under the fixed signal sequence. |
| Increment | What should this next piece of work deliver, and what decision should it enable? | Produce two reproducible queue traces so the team can decide what arrival records to request from operations. |
Then follow the trace back up. In the chapter's hypothetical review, the modeler and the operations engineer count the same first slot differently. The decision record can show why the next increment changes while the queue initiative and city vision still make sense. If the city instead gives pedestrian conflicts immediate priority, the team revisits the initiative. This lets a reader follow both the original choice and the reason for revising it. Existing review and decision record
Two proposed initiative cards for the intersection
Use separate cards to show how the city's vision leads to initiatives and exploratory increments. The queue initiative can illustrate how a possible later requirement links to a named test case. Develop the safety initiative around intent, affected people, relevant information and questions to investigate. Identify the queue requirement and test as illustrative proposals for a possible update.
Card 1. Reduce queues during bursts of arrivals. The first increment compares two arrival patterns under the existing fixed signal plan. It helps the team decide which field records to request. A later signal-plan update could have this requirement: for the agreed burst scenario, fewer vehicles shall remain on the named approach at the end of eight slots than under the reference plan. The linked test, Compare the candidate and reference plans under the same burst, runs both plans from the same initial queues with identical arrivals. It counts the waiting vehicles after service in slot eight and checks the specified difference. The first investigation changed the arrivals. The later test holds them fixed to assess the plan.
Card 2. Protect people crossing the path of a turning vehicle. Express the safety intent from the perspectives of people crossing, road users and operators. An exploratory increment can map the crossing and relevant turning movements and identify what the team needs to learn, such as how people use the crossing and what is known about vehicle movements. Capture the purpose and open questions as a possible safety initiative.
Why it pays to keep exploring
The team expects to revise both its assumptions and its proposed solution repeatedly. Show how to choose the least costly investigation that can credibly change the next decision. Two engineers can check one disputed slot by hand before investing in a model. If they expect to compare many candidate signal plans, keeping the inputs, expected results and reasons for past choices together can make each new comparison cheaper and preserve what the team has learned. Weigh the cost of building and maintaining the check against the cost of repeated manual work, delay and committing to the wrong design. This gives agile replanning its economic rationale in the example. Existing comparison of a hand check and a reusable check
Acceptance. A reader can trace an increment to the city's intent, follow a later requirement to the test case that checks it, and explain which part of the plan new evidence would change. The reader can also explain when the next investigation is worth its cost. Rebalance the section heading and planning example accordingly. Connect this explanation to Chapter 2's emerging requirements and the existing handoff to shared engineering knowledge in Chapter 4. Chapter 2 review #99 · Earlier Chapter 3 revision #62 · Course review #86
Activity