From 5e64d802ef3cbab50f5e462bf7e22d11101514a0 Mon Sep 17 00:00:00 2001
From: Anders Gustafsson <44322377+And-Gu@users.noreply.github.com>
Date: Tue, 24 Nov 2026 07:05:23 +0100
Subject: [PATCH 1/2] Connect useful product changes to the engineering
investment decision (#87)
---
...ing-the-machine-that-builds-the-machine.md | 22 ++--
.../01-the-new-engineering-paradigm.md | 10 +-
...ineering-in-small-reviewable-increments.md | 14 ++-
.../13-continuously-integrated-engineering.md | 12 +-
...eering-intent-to-continuous-integration.md | 18 +--
.../components/learning/DigitalThread.astro | 6 +-
.../learning/InvestmentFeedback.astro | 109 ++++++++++++++++++
site/src/data/v3-learning.test.ts | 1 +
site/src/pages/learn/v3/[slug].astro | 3 +
9 files changed, 165 insertions(+), 30 deletions(-)
create mode 100644 site/src/components/learning/InvestmentFeedback.astro
diff --git a/project/v3/bonus/building-the-machine-that-builds-the-machine.md b/project/v3/bonus/building-the-machine-that-builds-the-machine.md
index 1befcda..0d927e6 100644
--- a/project/v3/bonus/building-the-machine-that-builds-the-machine.md
+++ b/project/v3/bonus/building-the-machine-that-builds-the-machine.md
@@ -7,11 +7,11 @@ subtitle: "How GitHub, AI Agents, and Connected Information Are Changing the Eco
*How GitHub, AI Agents, and Connected Information Are Changing the Economics of Engineering*
-A consultant changes the email address for a customer’s service desk. The handbook, the trainer’s handout and the customer website all carry it. For a one-time handover, opening three files and checking the address in each could be the cheapest way to finish. If the consultant maintains those materials for years, every change brings the same search. Eventually it becomes worth asking the computer to remember where the address belongs.
+A consultant changes the email address for a customer’s service desk. The handbook, the trainer’s handout and the customer website all carry it. For a one-time handover, opening three files and checking the address in each could be the cheapest way to finish. If the consultant maintains those materials for years, every change brings the same search. How often would that search have to recur to make a shared source worth maintaining?
That decision used to come with a sizable bill. A requirements engineer might have a specialist system for requirements, Word for meeting notes, spreadsheets for estimates and a simulation tool for models. Each did its own job well. Connecting them meant agreeing on identifiers, writing and hosting integrations, maintaining them through upgrades and teaching colleagues how to use them. On a modest project, a person who knew the files could often do the work for less.
-Today a solo practitioner can rent the underlying computing capacity, keep a few sources under version control, run a check on every proposed edit and ask an agent to help maintain the connections. The economic change is in the **size of project that can justify the investment**. A single repeated handoff can be enough to try it.
+Today a solo practitioner can rent computing capacity, keep a few sources under version control, check each proposed edit and ask an agent to help maintain the connections. A smaller project might now justify that investment if one handoff recurs often enough. The consultant can test the idea against the cost of the next few updates.
## What is the smallest useful engineering environment?
@@ -46,12 +46,12 @@ Hand an agent three independent files and it has to infer which one governs the
GitHub made one form of this work generally available on October 28, 2026. GitHub Agentic Workflows compiles tasks described in Markdown into GitHub Actions workflows. A maintainer can give an agent a recurring job such as investigating failed documentation checks. The feature is available on GitHub Free, Team and Enterprise. Its default Copilot CLI engine requires a Copilot license, and execution costs still belong in the project’s calculation. [GitHub’s general-availability announcement](https://github.blog/changelog/2026-10-28-github-agentic-workflows-generally-available/).
-Lauren Tan gives a practitioner’s account in *All Code Is Slop (Except Mine)* at AI Engineer CODE 2026. Her team moved recurring review corrections into its client framework and lint rules, where an agent encounters a constraint as it works. It also gave agents ways to run the application and capture behavior for review. The same distinction applies to a handbook. A check can require a source ID in every generated excerpt. An editor still has to read the excerpt in the situation where a trainer will use it.
+In *All Code Is Slop (Except Mine)* at AI Engineer CODE 2026, Lauren Tan describes a rule her software team built into its Dune framework. Code that draws the interface cannot import code reserved for the main process. An agent encounters that rule on its next edit. To check how a feature actually behaves, the team also gives the agent a way to run the application and capture the interaction. A handbook check could require a source ID in every excerpt. An editor could then watch a new colleague use the excerpt to request access.
Watch Lauren Tan’s framework and runtime examples
- Tan introduces a constraint built into the team’s Dune framework at 5:00, then turns to runtime verification at 9:40. Watch the original recording on YouTube · Start at the framework example · Read the organizer’s session notes and transcript.
+ Dune’s framework rules (5:00) · Checking the running application (9:40) · Full recording · Organizer’s session notes and transcript.
## Four indicators, four different questions
@@ -64,6 +64,8 @@ GitHub counted **45.4 billion Actions jobs** on public and private repositories
In September 2026, **more than 40% of pull requests on GitHub** began with a first draft GitHub could attribute to a coding agent. The denominator is that month’s pull requests across public and private repositories. Detection can miss agent use. The measure identifies how work entered review. It leaves open how much a person revised, what checks ran and who approved delivery. [GitHub Octoverse workflow findings](https://github.blog/news-insights/octoverse/octoverse-commits-pushes-reach-new-highs-in-2026-as-developers-build-with-agents/#h-developers-are-reshaping-their-workflow).
+Demirer, Musolff and Yang followed developers’ public GitHub activity in a matched observational study. After adoption of coding agents, the authors estimated a larger percentage increase in commits than in releases. A release count brings us closer to delivery. Whether anyone benefited from an update takes evidence from its use. [NBER working paper, revised September 2026](https://www.nber.org/papers/w35275).
+
### Who maintains an internal platform? DORA’s survey
In DORA’s 2025 survey, **4,867 people** responded across industries and countries. From respondents’ accounts of their workplaces, DORA reported that **90%** of organizations had adopted at least one internal developer platform and **76%** had at least one dedicated platform team. These answers describe organizational practice in the survey. A solo consultant deciding whether to automate one handbook faces a different staffing question. [DORA’s platform findings, page 67](https://services.google.com/fh/files/misc/2025_state_of_ai_assisted_software_development.pdf#page=67) · [Survey population, page 103](https://services.google.com/fh/files/misc/2025_state_of_ai_assisted_software_development.pdf#page=103).
@@ -74,17 +76,21 @@ In January 2026, McKinsey modeled the worldwide market for light vehicles, inclu
## When does building it pay off?
-Count the work on both sides. A shared workflow can save a search for the latest decision, catch a mismatch before publication and carry a tested rule into the next update. It can also relieve a reviewer of comparing every copy by eye. Against that value, charge the time to establish the sources, learn the tools, review proposals, maintain rules when the outputs change and operate the process. Include hosting, model use and the time people spend investigating failed checks.
+Start with a small manual alternative. The consultant could keep a checklist of the three publications, open each one and have a reviewer compare the address with the service desk’s approved contact. On a monthly bulletin, how much time do those checks take, and how often does an old address get through? A shared source might save the reviewer a search or catch the mismatch before anyone reprints a handout. That avoided work can repay part of the investment before the update reaches a customer.
+
+For comparable updates, count what it costs to connect the source to all three outputs, integrate the generated copies and review the wording. Add hosting, agent runs, investigation of failed checks and repairs when a spreadsheet column or publication template changes. Tan describes how agents helped her team afford checks it once found too costly to maintain. She also describes spending much of her own model budget on verification. The consultant can price those costs locally and keep the checklist if it does the job for less. [Tan on creating and maintaining checks (11:51)](https://www.youtube.com/watch?v=O_zcc6Xl12g&t=711s).
-Frequency changes the calculation. A consultant who delivers one letter may finish before a publishing workflow would be ready. Someone running a monthly service bulletin can use the same source lookup, validation and build every month. If a client prohibits hosted processing or an authoritative spreadsheet has unstable columns, local setup and maintenance can absorb the savings. A sensible first investment is the smallest connection that resolves a real, repeated problem.
+The customer who pays for a corrected bulletin has a different question. After it goes out, do requests from readers of the new edition reach the right service desk on the first try? A service ticket that identifies the edition used and any rerouting would help answer that question. The customer and consultant can use those observations when deciding what the next update is worth.
## What might change from 2026 to 2030?
-The following are hypotheses a team can test as its work changes. Hosted workflows and reusable checks may bring the economical starting point down to a single author and a few dependent outputs. Stable identifiers, source links and revision history could then earn their keep earlier, while the author can still explain where every fact came from.
+One possibility is that a customer who benefited from a quicker update will ask for the same turnaround on the next order. That is the article’s hypothesis about buying decisions. Compare successive requests with similar scope and quality requirements, then ask the buyer what changed. A competitor’s offer or a new procurement policy could also explain a shorter deadline.
+
+Requirements can come directly from policy. The UK’s 2021 Information Management Mandate required infrastructure clients within its scope to specify in contracts what information they needed and what satisfactory delivery meant. It also required a way to receive and check that information digitally. Those buyers had a contractual reason to request usable information at handover regardless of how the supplier produced it. [UK Infrastructure and Projects Authority, Annex B, paragraph 8](https://www.gov.uk/government/publications/transforming-infrastructure-performance-roadmap-to-2030/transforming-infrastructure-performance-roadmap-to-2030#annex-b-information-management-mandate).
Ordinary knowledge work could gain more executable checks. A handbook can test a link, a report can reconcile units and a training package can check the revision of its procedure. If those checks travel between projects with their templates and agent instructions, some lessons learned on the first project can reduce setup on the second. Someone still needs to check whether the rule fits its new use.
-If agents produce drafts faster than people can assess them, a greater share of human attention may go to intent, interpretation and consequential decisions. Teams may spend less time waiting for a first version and more time waiting for the evidence that several changes work together. The intersection exercise gives that hypothesis a practical test. Speeding up the display build buys little when a required service instruction determines release day. [Chapter 13’s release decision](/executable-engineering-lab/learn/v3/13-continuously-integrated-engineering/#which-dependency-sets-the-release-date).
+If agents produce drafts faster than people can assess them, teams may spend less time waiting for a first version and more time waiting for evidence that several changes work together. In the intersection exercise, the display is ready while a required service instruction awaits review. If a test rig is still occupied when the reviewer finishes, what would earlier translation actually save on the path to release readiness? [Chapter 13’s release decision](/executable-engineering-lab/learn/v3/13-continuously-integrated-engineering/#which-dependency-sets-the-release-date).
## Measure one change of your own
diff --git a/project/v3/manuscripts/revised/01-the-new-engineering-paradigm.md b/project/v3/manuscripts/revised/01-the-new-engineering-paradigm.md
index b2800e9..0fbd7f5 100644
--- a/project/v3/manuscripts/revised/01-the-new-engineering-paradigm.md
+++ b/project/v3/manuscripts/revised/01-the-new-engineering-paradigm.md
@@ -23,7 +23,7 @@ Building that check improves how the organization engineers its products. Reusin
For a business competing on the quality and frequency of product improvements, the delivery objective is to get a useful change into service sooner, with evidence that it works. A team that produces changes faster than it can integrate or test them moves work into a queue.
-In a software-intensive program, an interface mismatch found at the end of that queue can send several teams back to trace dependencies, revise designs and repeat tests. That rework can take more engineering time than the original change, and a missed integration date can delay the release.
+On one sensor program, researchers traced eight years of change requests and found that a change in one subsystem could trigger work in another. If an interface mismatch surfaces at final assembly, the integration lead has to find those dependencies before the teams know which designs and tests to revisit. [Giffin and colleagues’ study of change propagation](https://research.tudelft.nl/en/publications/change-propagation-analysis-in-complex-technical-systems/).
A web service may deploy repeatedly, embedded software may need controlled integration, and a physical design may depend on an expensive component order or a scarce slot on a test rig. Each team can shorten the path from a question to reliable feedback within its own delivery constraints.
@@ -45,15 +45,17 @@ Giving an agent access to current definitions, maintaining independent checks an
## Two systems must evolve together
-Every engineering organization is developing two related systems.
+Systems engineering asks how the parts work together under the conditions people face. Does the receiver get the reading in time when the system is busy? Answering that question takes work on two systems.
The **product system** includes software, electronics, physical components, interfaces, operators and the operating environment. It is judged by what it can actually do, under the conditions that matter.
The **engineering system** includes the people, methods, engineering knowledge, executable models, automated tests and integration equipment used to design, build and validate the product. It is judged by how well it helps the organization make sound product decisions and deliver improvements.
+
+
A Word specification can explain an interface decision, an Excel workbook can hold its limits, and a specialist design tool can show how the circuit uses them. When those sources travel separately, reviewers have to establish which revisions belong together. The team can keep those tools, agree where to maintain a structured interface definition and connect it to the models and tests that use it.
-**“We build the machine that builds the machine.”** A difficult product question may reveal the need for a new simulation or test fixture. A better engineering capability may make previously expensive options practical to investigate. Managers can fund a check that removes a recurring delay and keep a handoff manual when the cost of automating it outweighs the benefit. The bonus article follows that investment in a small documentation team. [Building the Machine That Builds the Machine](/executable-engineering-lab/bonus/building-the-machine-that-builds-the-machine/).
+**“We build the machine that builds the machine.”** On one software team at OpenAI, agents helped write tools that flagged dependencies its engineers had ruled out. The next proposed change would encounter the same rule. A team comparing sender and receiver units can start smaller, with an engineer checking the two definitions by hand until the volume of changes justifies maintaining a tool. [How the OpenAI team built its checks](https://openai.com/index/harness-engineering/) · [A small team’s investment decision](/executable-engineering-lab/bonus/building-the-machine-that-builds-the-machine/#when-does-building-it-pay-off).
> **Concept**
>
@@ -74,7 +76,7 @@ If mismatches now surface early but the release still depends on timing under lo
> **Explore further**
>
-> [Revisit this investment in the final chapter](14-from-engineering-intent-to-continuous-integration.md). Which part of a check can another project reuse, and which observation must its team make again?
+> Which part of a check can another project reuse, and which observation must its team make again? [Revisit this investment in the final chapter](14-from-engineering-intent-to-continuous-integration.md#reuse-capability-while-renewing-evidence).
diff --git a/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md b/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md
index 70e9032..d9554bb 100644
--- a/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md
+++ b/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md
@@ -29,13 +29,23 @@ Imagine the traffic engineer opening Chapter 7’s reviewed brief in an agent’
The first checkpoint answers one question. Can the engineer trust the change across the boundary? Compare every first-cycle row for A and B, then inspect B’s first green in cycle two. The recorded run shows a north–south departure before any new north–south vehicle arrives. With those checks in hand, the engineer can authorize the full comparison. [First-cycle reference rows](../../case-study/trace-v1.csv) · [Recorded two-cycle calculation](https://github.com/And-Gu/executable-engineering-lab/blob/973ff66ebb06daafbd2ddaf35682e0e8da2bffd7/project/v3/case-study/two-cycle-run.json).
-Suppose B shows zero north–south vehicles at the start of slot 9. The next job is to find where the two vehicles went. Compare the last row of cycle one with the state passed into the next slot. If the calculation initializes the queue twice, the agent can fix that error and rerun the checks. If the calculation carries two vehicles but the report shows zero, inspect which state the report reads. If the agent finds conflicting definitions of what to count, it should bring the first disputed row and the two definitions to the model owner. The answer changes what the experiment measures.
+Before asking the agent to try again, look for the observation that would change your next instruction.
+
+| What needs explaining? | What should the engineer or agent do? |
+| --- | --- |
+| **The request is ambiguous.** “Does the queue grow?” could mean growth between cycle ends or a peak within one cycle. | Ask the traffic engineer which comparison will inform the decision. The two questions call for different rows. |
+| **The runner used the wrong B.** The queue after slot 2 looks right, but a north–south vehicle arrived and departed there. | Check the input revision. In the original B there is no north–south arrival or departure in slot 2. Select the original and rerun B. |
+| **A check could miss an error.** The east–west queue is empty at the first boundary in both original patterns. | Try Chapter 8’s case with east–west vehicles still waiting. A reset of just that queue would now be visible before the next arrivals. |
+| **The report disagrees with the carry rule.** Two north–south vehicles finish slot 8 in B, yet the report shows zero before arrivals in slot 9. | Inspect the state passed to slot 9. If it is empty, repair the handoff. If both vehicles are there, trace which state the report reads. Rerun the boundary check after the fix. |
+| **The engineer wants a different experiment.** The new request is for two independent windows, each starting empty. | Have the engineer approve a revised brief. Keep the original continuous run for decisions that relied on carry-over. |
+
+The engineer can check a proposed test against the agreed carry rule and the first-cycle rows against a separate calculation. Copying expected counts from the changed runner would carry its mistakes into the test. Anthropic’s evaluation guide gives another example. A grader can reject a working script if it expects a file path the task never specified. [How the reference rows were checked](../../case-study/MODEL-CHECK.md#independent-editorial-cross-check-already-performed) · [Anthropic’s guidance on tasks and graders](https://www.anthropic.com/research/demystifying-evals-for-ai-agents).
## Delegate a day’s work with room for exceptions
-In Chapter 8, the engineer could ask for help with one task or delegate an outcome. Before handing over a larger outcome, ask the agent to predict B’s first departure from the brief. Try a deliberate queue reset and see whether an independently written check catches it. Once the smaller assignments have shown that the agent understands the specification and that the tests catch mistakes, the engineer can put more work between reviews. [Chapter 8’s working agreement](08-directing-ai-engineering-agents.md).
+In Chapter 8, the engineer could ask for help with one task or delegate an outcome. Before handing over a larger outcome, ask the agent to predict B’s first departure in cycle two from the brief. Try a deliberate reset and see whether the check catches it. If it does, the engineer can delegate further runs with the same carry rule and ask to see the first disputed row whenever a case falls outside it. [Chapter 8’s boundary exercise](08-directing-ai-engineering-agents.md#try-the-assignment-and-inspect-an-assumption).
For a package that might span a working day, the engineer and agent could agree on three separately reviewable changes.
diff --git a/project/v3/manuscripts/revised/13-continuously-integrated-engineering.md b/project/v3/manuscripts/revised/13-continuously-integrated-engineering.md
index fed860c..bcaff32 100644
--- a/project/v3/manuscripts/revised/13-continuously-integrated-engineering.md
+++ b/project/v3/manuscripts/revised/13-continuously-integrated-engineering.md
@@ -17,11 +17,11 @@ Imagine a technician looking up a new message on the intersection service displa
## Decide what the request covers
-Chapter 12 left an important decision open. The proposed controller contract, revision A, expects confirmation that the lamp changed. The adapter contract, revision B, establishes receipt of a message. The team deferred accepting the two meanings as equivalent. An independent observation of the lamp on a bench is still proposed. [Fictional interface and decision record](https://github.com/And-Gu/executable-engineering-lab/blob/05b071d8d5a08aec9017146175e0ac17b38f8dd3/project/v3/case-study/DECISION-CHAIN.md#ch09-a-product-interface-discrepancy--the-missing-bridge).
+Chapter 12 left an important decision open. The proposed controller contract, revision A, calls for confirmation of the requested indication. Under the adapter contract, revision B, an acknowledgment would confirm receipt of the message. The accountable product decision-maker deferred accepting the two meanings as equivalent. An independent observation of the lamp on a bench is still proposed. [Fictional interface and decision record](https://github.com/And-Gu/executable-engineering-lab/blob/05b071d8d5a08aec9017146175e0ac17b38f8dd3/project/v3/case-study/DECISION-CHAIN.md#ch09-a-product-interface-discrepancy--the-missing-bridge).
For this release-planning exercise, assume an existing product configuration authorized to report receipt and an unknown indication. The service team asks for clearer wording and a procedure for its existing diagnostic code, `IND-UNKNOWN`. The operator should be able to name the affected head and command. A technician should be able to find the right instruction and observation equipment. A request to determine what the lamp actually displayed would reopen the interface decision.
-The lead accepts the bounded request and starts the clock. For eligible changes like this one, the project aims to have a releasable configuration in **less than 24 hours**. The clock stops when the authorized lead has the running version, the evidence and everything its users need, and records that it is releasable. The lab has no measured delivery time for this example.
+The clock starts when the lead accepts this eligible, bounded request. The fictional project’s target is **less than 24 hours**. The clock stops when the authorized lead records that the identified whole-product candidate is releasable, with its evidence and all the material its users need. The lab has no measured delivery time for this example. [DORA’s distinction between continuous delivery and deployment in software](https://dora.dev/capabilities/continuous-delivery/).
## Follow the diagnostic into service
@@ -48,7 +48,7 @@ The procedure points to a portable observation kit. A technician needs to find t
## Which dependency sets the release date?
-Suppose the running candidate and its checks are ready today. The operator editions, logistics record and training package have cleared review. One required translation of the **service instruction** is due next week. Its file exists, but the service-language reviewer still has to confirm that readers will understand the indication is unknown. Can the lead stop the clock today?
+Suppose the running candidate and its checks are ready today. The operator editions, logistics record and training package have cleared review. One required translation of the **service instruction** is due next week. Its file exists, but the service-language reviewer still has to check that the wording describes the indication as unknown. Watching a technician use that edition in the rehearsal would test how they interpret it. Can the lead stop the clock today?
@@ -62,7 +62,9 @@ Suppose the running candidate and its checks are ready today. The operator editi
“We build the machine that builds the machine.” On each new project, the team has to deliver and operate the engineering environment alongside the product. For this change, the product lead sets aside people, iteration time and funding for the recurring work. The interface owner maintains the diagnostic definition. An integration engineer maintains the rig, automated tests and versioned evidence. Service and training leads maintain the publication workflow, arrange language reviews and budget for the reviewers’ time. When a check stops working, its owner restores it before the lead relies on its result. [The two systems in the introduction](/executable-engineering-lab/#approach).
-Here the wait gives the team a specific investment to consider. When the next diagnostic change is accepted, its shared identifier could open review requests for the affected manual editions and training material immediately. The release check could flag any edition still tied to the previous wording. If the language reviewers work alongside implementation and all checks clear on the same candidate, the lead could make the whole-product decision within the one-day target. The team can use that routing and check again, with fresh approvals for each new fault message.
+Does language review regularly hold up the decision? Compare several eligible diagnostic wording changes with similar review requirements and numbers of editions. For each, record the full time to releasability and when the rig, language reviewers and other required inputs were available. For requests still open, record the time so far and the outstanding work. A day spent waiting for both a rig and a reviewer counts once on the release clock. Also record reviewer hours, rework and any misleading instructions found in the rehearsal.
+
+If a late start on translation repeatedly delays readiness, try inviting the affected reviewers when the lead accepts the request. That takes one message. Compare the next similar changes for elapsed time and instruction quality. If coordinating the editions still takes considerable effort, the diagnostic identifier could route review requests and flag stale wording. Weigh the time saved against the cost of keeping that routing current and reviewing exceptions.
For a closer look at when building and maintaining that environment pays off, read the unnumbered companion. [Building the Machine That Builds the Machine](/executable-engineering-lab/bonus/building-the-machine-that-builds-the-machine/).
@@ -74,6 +76,6 @@ For a closer look at when building and maintaining that environment pays off, re
## Make the whole-product decision
-**Today the release lead holds the candidate.** Next week, if the language reviewer approves the service instruction, the team builds that edition into the package and checks that the display opens it for the right diagnostic. With the other evidence still applicable, the lead can record that the identified whole-product configuration is releasable. Operations can then select a deployment date. In this example the last required service instruction sets the earliest release date, and the missed one-day target tells the team exactly where to improve its next iteration.
+**Today the release lead holds the candidate.** Next week, if the language reviewer approves the service instruction, the team builds that edition into the package and checks that the display opens it for the right diagnostic. With the other evidence still applicable, the lead can record that the identified whole-product configuration is releasable. Operations can then select a deployment date. The missing instruction sets the earliest readiness date in this example. This one delay gives the lead a candidate to investigate on the next comparable request.
On the next change, which parts of this work can the team reuse, and what does it have to observe again? [Follow the decisions through the course in Chapter 14](14-from-engineering-intent-to-continuous-integration.md).
diff --git a/project/v3/manuscripts/revised/14-from-engineering-intent-to-continuous-integration.md b/project/v3/manuscripts/revised/14-from-engineering-intent-to-continuous-integration.md
index b87eac9..b5b3e11 100644
--- a/project/v3/manuscripts/revised/14-from-engineering-intent-to-continuous-integration.md
+++ b/project/v3/manuscripts/revised/14-from-engineering-intent-to-continuous-integration.md
@@ -39,7 +39,7 @@ This returns to Chapter 1's central delivery argument: a model can provide feedb
A requirement may sit in one system, an interface decision in another and test evidence in a third. A drawing, software build and service instruction may each be correct on their own while referring to different product revisions. When those relationships live mainly in people’s memories, every change creates coordination work.
-A connected information environment does more than make documents searchable. It gives important objects stable identities, records the revisions used together and preserves the relationships between intent, definition, implementation, evidence and decision. Specialist tools can remain where they are. The engineering system maintains enough structure to tell a reviewer what belongs to the current change and where to inspect the source.
+A connected information environment gives important objects stable identities and records which revisions belong together. A reviewer can trace a changed definition to the evidence for a decision while the sources stay in their specialist tools. In one manufacturing case, researchers used a graph to connect design, manufacturing and quality records this way. [Hedberg and colleagues’ manufacturing study](https://www.nist.gov/publications/using-graphs-link-data-across-product-lifecycle-enabling-smart-manufacturing-digital).
That creates leverage in three ways.
@@ -51,7 +51,7 @@ The value is the ability to act on the information, not the number of connection
AI agents add a new operating capability when they can work with this environment.
-An agent can receive an engineering question or a bounded outcome, inspect the relevant sources, use tools, run checks, investigate a failure and refine a proposal before handing it back. That is different from generating another isolated document. The agent works through part of the engineering flow.
+An agent can receive a bounded engineering question, inspect the relevant sources, run a check and use its result to decide what to try next. An engineer can then review the proposal and the evidence the agent returns. Anthropic describes this use of tool results to guide an agent’s next action in its engineering guidance. [How agents work with tool feedback](https://www.anthropic.com/research/building-effective-agents).
Early in the work, that flow can be deliberately exploratory. A team may “vibe code” a disposable software interface—steering generated behavior by trying it—while agents draft small models or simulations for selected questions. These artifacts are valuable for the questions they sharpen, not for their readiness for delivery.
@@ -61,7 +61,7 @@ This is not a one-way maturity ladder. Exploration continues beside delivery. As
-The quality of that work depends on the machine around it. The question or objective must be clear enough to define the next useful check. The agent needs current definitions and the permissions required for the task. Checks must provide feedback that is meaningful and sufficiently independent of the proposal. Exceptions need an owner, and consequential product decisions remain with people who hold the relevant authority.
+The quality of that work depends on the machine around it. The question or objective must be clear enough to define the next useful check. The agent needs current definitions and the permissions required for the task. Checks must provide feedback that is meaningful and sufficiently independent of the proposal. Exceptions need an owner, and consequential product decisions remain with people who hold the relevant authority. [The reviewed brief](07-spec-driven-development-without-waterfall.md#the-agent-brief) · [The agent’s working context](08-directing-ai-engineering-agents.md#context-is-an-engineering-capability) · [Who can accept the interface](12-governance-and-engineering-authority.md#what-would-let-maya-accept-the-interface).
Maintaining source connections, permissions, independent checks and review capacity belongs in the investment case. Agentic support creates leverage only while the engineering environment remains trustworthy enough to direct and evaluate the work.
@@ -77,11 +77,13 @@ The engineering system needs two connected feedback loops.
The fast loop works inside a change. Engineers and agents update a definition or implementation, run a model or check, inspect the result and correct the work. This loop can remove waiting between an idea and an initial technical finding.
-The whole-product loop asks whether the integrated change works for its intended use. It includes physical behavior, operational conditions, cybersecurity, service information, manufacturing or logistics dependencies and release authority. Its evidence may arrive on different cadences from software checks.
+The whole-product loop asks whether the integrated change works for its intended use. It includes physical behavior, operational conditions, cybersecurity, service information, manufacturing or logistics dependencies and release authority. Its evidence may arrive on different cadences from software checks. NASA’s engineering handbook, for example, distinguishes verifying a product against its requirements from validating it in its intended use. [NASA’s guidance on product realization](https://www.nasa.gov/reference/5-0-product-realization/).
The loops support each other. A physical or operational finding can improve the next automated check. A fast check can keep known errors away from scarce integration equipment. The result is a system that learns from product work and carries that learning into the next change.
-The intersection illustrates the relationship: a software-visible receipt established that a command arrived, not what the lamp displayed. The same pattern appears whenever digital evidence accelerates a decision without replacing the physical or operational evidence the product still requires.
+At the intersection, the engineers inspected two proposed contracts. Under the adapter contract, a receipt would confirm that a command arrived. Establishing which lamp was visible would still require an independent observation matched to the head, command and configuration. The bench observation is proposed. [The two interface definitions](10-from-models-to-an-integrated-product.md#one-word-two-different-interfaces).
+
+If the service update later reaches a technician who orders a kit that does not fit, an agent could propose a check against the head-to-kit mapping agreed by service and logistics. The service lead could review the check and watch a technician try the revised instruction before deciding whether to fund its upkeep. [Chapter 1’s investment decision](01-the-new-engineering-paradigm.md#investment-feedback).
## Invest in flow, not isolated automation
@@ -91,9 +93,9 @@ More code, faster analysis or quicker document generation can all help. They do
Not every exploratory artifact should become a delivery asset. Some prototypes have done their job once they expose an assumption or eliminate an option. For selected results, the learning—not necessarily the prototype—needs to mature. The governing information becomes versioned, the relevant model or implementation gets an explicit configuration, checks become repeatable and the relationship to the release becomes visible. The organization gains speed when it can preserve the learning without carrying every experiment into production.
-Connected information reduces time spent finding and reconciling sources. Executable checks shorten the path to technical feedback. Agents can absorb bounded investigation and correction work. Explicit configurations reduce the work of assembling evidence for review. Bringing service, training and operational material into the same change exposes release dependencies early enough to address them in parallel.
+Connected information can save a reviewer time finding and reconciling sources when their owners keep the links and revision records current. Executable checks shorten the path to technical feedback. Agents can absorb bounded investigation and correction work. Explicit configurations reduce the work of assembling evidence for review. Bringing service, training and operational material into the same change exposes release dependencies early enough to address them in parallel.
-This does not force every discipline into the same cadence. Electronics, mechanics, software, physical testing and service preparation retain different constraints. The engineering system connects their feedback and shows which dependency controls the next decision.
+Electronics, mechanics, software, physical testing and service preparation retain different constraints. On the OpenTitan silicon project, for example, a proposed change receives selected simulation and board tests. A broader suite runs overnight. The engineering decision determines which result the team needs to wait for. [lowRISC’s account of the OpenTitan test pipelines](https://lowrisc.org/news/how-we-run-ci-for-our-open-source-silicon-projects/).
Continuous integration makes divergence across those disciplines visible while the change is still being assembled. Continuous delivery keeps an identified, complete package ready for release. Deployment remains an authorized operational decision.
@@ -117,7 +119,7 @@ This distinction is what allows reuse to scale without turning history into assu
> **Explore further**
>
-> The companion article follows the same investment logic from a small documentation workflow to a reusable engineering environment. [Building the Machine That Builds the Machine](/executable-engineering-lab/bonus/building-the-machine-that-builds-the-machine/) · [The New Engineering Paradigm](01-the-new-engineering-paradigm.md#two-systems-must-evolve-together).
+> The companion article compares the cost of a manual handoff with a reusable check on a similar update. [Measure one change of your own](/executable-engineering-lab/bonus/building-the-machine-that-builds-the-machine/#measure-one-change-of-your-own).
diff --git a/site/src/components/learning/DigitalThread.astro b/site/src/components/learning/DigitalThread.astro
index a169c46..f4f20b4 100644
--- a/site/src/components/learning/DigitalThread.astro
+++ b/site/src/components/learning/DigitalThread.astro
@@ -17,7 +17,7 @@ const forward = [
{ title: 'Plan the first increment', text: 'Engineer and agent agree to preserve the first cycle and test the boundary before extending the assignment.' },
{ title: 'Implement within the harness', text: 'Project instructions and permissions govern what the agent can read, change and run.', link: sources.harness, label: 'Working agreement' },
{ title: 'Run the affected checks', text: 'Compare the first eight slots with the saved trace, then check the queues and departures in slot 9.', link: sources.tests, label: 'Regression checks' },
- { title: 'Decide and record why', text: 'The engineer reviews the run, identifies affected decisions and records an accepted rule under a new revision. Prior results keep their original inputs.', link: sources.result, label: 'Existing run record' },
+ { title: 'Read the saved result', text: `In B, slot 9 starts with ${scenario.before_next_arrivals.NS} north–south vehicles still waiting. The saved row records a departure from that queue on green.`, link: sources.result, label: 'Recorded two-cycle calculation' },
];
const backward = [
{ title: 'Observed departure', text: `Scenario B records ${scenario.first_slot_of_second_cycle.departures.NS} north–south departure in slot 9. Start with the observation the engineer is reviewing.`, link: sources.result, label: 'Recorded boundary row' },
@@ -33,9 +33,9 @@ const backward = [
-
+
- {[{ id: 'backward', title: 'From a result to its rule', steps: backward }, { id: 'forward', title: 'From a rule to the next decision', steps: forward }].map(path =>
+ {[{ id: 'backward', title: 'From a result to its rule', steps: backward }, { id: 'forward', title: 'From the carry-over rule to the saved run', steps: forward }].map(path =>
{path.title}
{path.steps.map(step =>
diff --git a/site/src/components/learning/InvestmentFeedback.astro b/site/src/components/learning/InvestmentFeedback.astro
new file mode 100644
index 0000000..d13ba06
--- /dev/null
+++ b/site/src/components/learning/InvestmentFeedback.astro
@@ -0,0 +1,109 @@
+
+
When is an interface check worth maintaining?
+
+
+
Customer requestsHow often would a quicker update help someone using the product?
+
+
+
Funding decisionThe owner compares the cost of another manual review with the cost of building and maintaining a check.
+
+
+
Maintained toolsIf funded, the interface owner keeps the unit definitions, comparison tool and reference cases current.
+
+
+
Fast feedback on one taskAn agent compares the units, corrects a mismatch in its proposal and reruns the check.
+
+
Back to the toolsThe agent can propose a better check. The interface owner reviews it against the agreed units.
+
Back to the funding decisionCatching a mismatch before assembly can save rework or a second rig visit.
+
+
+
+
Whole-product reviewEngineers integrate the change and test the receiver under load. After an authorized release, operations can put it into service.
+
+
+
Customer outcome in useA customer paid for this update. Did the reading reach the operator in time to act?
+
+
Back to the funding decisionWhat customers actually gained from the update informs the owner’s next investment.
+
Possible return to customer requestsA customer who benefited may ask for the same turnaround on the next order.
+
+
+
+
+
+
+
+ Follow one change down the figure. The return paths show what could justify a better tool or another investment across successive changes. The dashed path is a hypothesis about future demand.
+
+
+
diff --git a/site/src/data/v3-learning.test.ts b/site/src/data/v3-learning.test.ts
index 75b735f..6a6bf4b 100644
--- a/site/src/data/v3-learning.test.ts
+++ b/site/src/data/v3-learning.test.ts
@@ -6,6 +6,7 @@ import { chapterQuizzes, chapterSections, quizSchema } from './v3-learning';
describe('V3 chapter activities', () => {
it('binds all active manuscripts to their own questions and slots', () => {
const slots: Record = {
+ '01': ['investment-feedback', 'chapter-quiz'],
'04': ['change-impact-figure', 'chapter-quiz'],
'05': ['intersection-model', 'chapter-quiz'],
'06': ['two-cycle-experiment', 'chapter-quiz'],
diff --git a/site/src/pages/learn/v3/[slug].astro b/site/src/pages/learn/v3/[slug].astro
index ce82339..915a4d6 100644
--- a/site/src/pages/learn/v3/[slug].astro
+++ b/site/src/pages/learn/v3/[slug].astro
@@ -8,6 +8,7 @@ import IntegratedChange from '../../../components/learning/IntegratedChange.astr
import ReleaseReadiness from '../../../components/learning/ReleaseReadiness.astro';
import ChapterQuiz from '../../../components/learning/ChapterQuiz.astro';
import ChangeImpactFigure from '../../../components/learning/ChangeImpactFigure.astro';
+import InvestmentFeedback from '../../../components/learning/InvestmentFeedback.astro';
import TwoCycleExperiment from '../../../components/learning/TwoCycleExperiment.astro';
import DigitalThread from '../../../components/learning/DigitalThread.astro';
import QueueExperiment from '../../../components/learning/QueueExperiment.astro';
@@ -40,6 +41,7 @@ type Heading = { depth: number; slug: string; text: string };
const headings: Heading[] = getHeadings().filter((h: Heading) => h.depth === 2);
const questions = chapterQuizzes.get(frontmatter.id);
const activities = ['chapter-quiz'];
+if (frontmatter.id === 'eel-v3-ch01-new-paradigm') activities.push('investment-feedback');
if (frontmatter.id === 'eel-v3-ch04-engineering-knowledge') activities.push('change-impact-figure');
if (frontmatter.id === 'eel-v3-ch05-models-prototypes') activities.push('intersection-model');
if (frontmatter.id === 'eel-v3-ch06-engineering-data') activities.push('two-cycle-experiment');
@@ -70,6 +72,7 @@ const sourceUrl = `https://github.com/And-Gu/executable-engineering-lab/blob/mai
{questions ? sections.map(section => {
if (section.kind === 'prose') return ;
+ if (section.content === 'investment-feedback') return ;
if (section.content === 'change-impact-figure') return ;
if (section.content === 'intersection-model') return ;
if (section.content === 'two-cycle-experiment') return ;
From 80e6f526669d34006529550a97438c52db85aae5 Mon Sep 17 00:00:00 2001
From: Anders Gustafsson <44322377+And-Gu@users.noreply.github.com>
Date: Tue, 24 Nov 2026 07:19:44 +0100
Subject: [PATCH 2/2] Require both a correct prediction and an independent
check before delegation (#87)
---
.../revised/09-engineering-in-small-reviewable-increments.md | 2 +-
1 file changed, 1 insertion(+), 1 deletion(-)
diff --git a/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md b/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md
index d9554bb..5f897c0 100644
--- a/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md
+++ b/project/v3/manuscripts/revised/09-engineering-in-small-reviewable-increments.md
@@ -45,7 +45,7 @@ The engineer can check a proposed test against the agreed carry rule and the fir
-In Chapter 8, the engineer could ask for help with one task or delegate an outcome. Before handing over a larger outcome, ask the agent to predict B’s first departure in cycle two from the brief. Try a deliberate reset and see whether the check catches it. If it does, the engineer can delegate further runs with the same carry rule and ask to see the first disputed row whenever a case falls outside it. [Chapter 8’s boundary exercise](08-directing-ai-engineering-agents.md#try-the-assignment-and-inspect-an-assumption).
+In Chapter 8, the engineer could ask for help with one task or delegate an outcome. Before handing over a larger outcome, ask the agent to predict B’s first departure in cycle two from the brief. Try a deliberate reset and see whether the check catches it. If the agent correctly predicts one north–south departure in slot 9 and an independent check catches the reset, the engineer can delegate further runs with the same carry rule and ask to see the first disputed row whenever a case falls outside it. [Chapter 8’s boundary exercise](08-directing-ai-engineering-agents.md#try-the-assignment-and-inspect-an-assumption).
For a package that might span a working day, the engineer and agent could agree on three separately reviewable changes.